Saturday, 28 July 2012
VANCOUVER SkyTrain
Monday, 23 July 2012
TACOMA Streetcar
SEATTLE Urban Rail Systems
- Downtown tunnel: from Westlake to south of International District/Chinatown station – this section runs in twin bored tunnels with very spacious stations opened for trolleybus operation in 1990 (in fact they were hybrid diesel/electric buses operating as diesel buses outside the tunnel and switching to trolley operation through the tunnel). The section was later rebuilt to accommodate the new light rail line (there were initial provisions with tracks laid, etc, but these had to be replaced anyway, and the trackbed was lowered). The three fully underground stations belong to the most impressive underground structures in the U.S., especially Westlake and Pioneer Square. Westlake has a large mezzanine level running above the entire station with openings over the platform areas and several direct accesses to adjacent department stores or malls. Pioneer Square and University Street, however, are open spaces with “balconies” at each end, with dimensions similar to the Washington DC Metro. I guess the platforms are about 100 m long, if not more. International District/Chinatown station is a subsurface station with a partly open ceiling and entrance structures on the surface in a style you might also find in some German cities. Pioneer Square and Westlake, however, reminded me more of the Moscow Metro with elegant finishings in granite and marble.The buses now sharing the tunnel are no longer trolleybuses, but special low-emission diesel-electric buses with an additional battery. There is a description on the King County Metro website, and in fact you don't smell any diesel exhaust fumes. I don't know why they couldn't maintain the trolley wires, as trolleybuses and trams often operate next to each other, like in San Francisco, Zürich or Geneva. Somebody who understands electrical issues better may be able to explain this.The buses serve one more station just outside the northern tunnel portal at Convention Center, but this is not served by the light rail trains, for which a stub for reversing was built right under Pine Street diverging east from the original bus tunnel. This stub is also the starting point for the northern extension to Capitol Hill and University of Washington, now under full construction and opening in 2016. At University of Washington, my first thought was, why is the station so far from the central area of the campus? Probably the cheapest site to build such a station??
- The SODO section (south of downtown) is a typical light rail route with a few level crossings along an otherwise segregated alignment. This includes two at-grade stations, Stadium and SODO, located adjacent to the SODO Busway (which also has numerous at-grade intersections).
- After SODO, trains climb onto a viaduct, pass a triangular junction leading to the depot, before entering the Beacon Hill tunnel, with a deep-level tube station of the same name. At 49 m below street level, it is one of the deepest stations in the U.S. There are four fast lifts taking passengers to the surface. The twin tube tunnels continue east and emerge onto another viaduct, which accommodates the elevated Mount Baker stations. So this section can be qualified as “full metro”.
- Just after Mount Baker, a ramp takes trains down to street level, and although throughout on a reserved lane in the middle of Martin Luther King Jr Way South, there are several intersections which reduce travel speed. Notably at Graham Street trains may have to wait for a long time to get a green line in the general traffic cycle. There are three surface stops on this section. South of Rainier Beach station, there are reversing sidings, but I'm not sure whether these are used in regular service. I did not understand why this initial line has to take this detour to serve this area as it does not seem to generate that many passengers, instead the trip to the airport is lenghtened in time.
- About 1 km south of Rainier Beach stations, trains again climb onto an elevated structure and remain there for most of the remaining section to the Airport terminus. It is a long run to reach Tukwila International Boulevard station, and this section required significant gradients, caused by topography. The line was also built on a rather high structure to fly over several freeway junctions. A stretch between Tukwila Intl Blvd and the Airport is at grade in the middle of the airport access road. The long distances between stations on this metro-like section make me wonder why they didn't choose a proper metro alignment for the entire line (on the other hand, why doesn't Denver built a light rail to the airport with similar characteristics?). The giant Tukwila Intl. Blvd station is a major train/bus interchange. The Airport station is directly at the airport, but to get to it you need to walk through a multi-storey car park. The trains reverse in the station, there are only short stubs beyond the platform (a short southern extension is planned for the mid-term future).
Monday, 16 July 2012
SALT LAKE CITY Trax
Friday, 13 July 2012
DENVER Light Rail
Sunday, 3 April 2011
Down Under Tour 2011: PERTH
The best for the end – after having seen all Australian urban rail systems, I daresay that Perth boasts the best of all. Although there is always something to improve and criticise, I think that other cities, notably Adelaide, should have a look at the Perth rail system to see what can be achieved in an acceptable period of time. Until around 1990, the Perth rail system looked a bit like the current Adelaide system, old-fashioned lines with diesel-powered trains. Then the existing three lines that radiated from Perth were electrified, and eventually two completely new lines were built, the ridership of which exceeded expectations by far.
The present system consists in fact of two cross-city lines plus one radial line with two branches, although officially the network is shown with five radial lines. In normal operation however, the Joondalup and Mandurah Lines, as well as the Fremantle and Midland Lines, form a single line, although there is a buffer of a few minutes built into the timetable at Perth station. Unfortunately this way of presenting the lines can be rather confusing especially for occasional travellers who want to continue their journey beyond the city centre on the same line and find out only once they arrive at Perth station that the train they are on actually continues to their destination anyway. On the Joondalup/Mandurah Line, the lines are shown as overlapping between Perth Underground and Esplanade and announcements inside the train in fact tell people that the train goes to Clarkson or Mandurah, respectively, but I have not observed anything like that on the Fremantle/Midland Line. So my proposal is to rename these lines officially as “Fremantle & Midland Line” and “Joondalup & Mandurah Line”. The fifth line is shown as Armadale/Thornlie Line, with the Thornlie Line operating as 'Local' on the share section (except Beckenham, which is served by Armadale trains). All lines are identified by colours, which are also used on station signs.
What makes me classify the Perth rail system as the best in Australia are the following factors:
its travel speed, both real (on the Mandurah Line trains reach a maximum speed of 130 km/h!) and perceived (short station dwelling time)
short intervals with a train every 15 minutes at all stations during off-peak daytime hours and extra trains during peak
stopping patterns (mostly for peak-hour service) are well illustrated on the platforms and in printed timetables, and the train's destination display also includes this as a letter code
pleasant rolling stock offering a very smooth ride
multi-access stations, mostly with entrances at either end of the platform to avoid long detours
full accessibility via lifts or ramps
operationally three clearly segregated lines
fully integrated fare system
To increase capacity on the older lines, the A-series rolling stock was refurbished with longitudinal seating throughout, which gives them a rather metro-like feel. Due to limited platform lengths, only 4-car trains can operate on these lines, whereas on the new north-south route the newer and faster B-series trains are used which run either as 3-car or as 6-car compounds.
Most stations on the older lines look pretty simple, which makes the system appear more like a high-floor light rail system. On these lines there a several level crossings, although fewer than for example in Melbourne. The Joondalup & Mandurah Line, however, is completely grade-separated and all stations boast a substantial structure, although there seems to be a theme running through them (the use of corrugated sheet-metal, traditionally used for construction in the region), which makes them look a bit shabby especially at the stations located in the median of a freeway (both the Joondalup and Mandurah Line were built largely in the median of a freeway), but generally they offer a pleasant atmosphere.
While the north-south route is completely separate from the other lines (there are track links west of Perth station), even the Armadale/Thornlie Line is separate from the Fremantle & Midland Line, with the section between Perth station and Claisebrook (also the location of the older depot) is four-track. On the Midland branch, a few passenger trains can be seen, the daily Prospector to/from Kalgoorlie and the twice-weekly Indian Pacific to/from Sydney and Adelaide. As these trains run on standard gauge and the Transperth system is narrow gauge (1067 mm), the section between the long-distance terminal at East Perth and Midland has 3-rail tracks. Freight traffic, however, is diverted towards Fremantle on a southern bypass route and only interferes with Transperth services on the bridge across the Swan River in Fremantle.
The biggest criticism I would make about the Perth rail system is the excessive station distance on the new north-south line, both on the slightly older Joondalup Line and on the recent Mandurah Line. With many stations located in the median of a freeway and huge car parks adjacent to them, there is hardly anyone who lives within an acceptable walking distance. Except for Joondalup station, which is next to a large shopping mall, all stations are in the middle of nowhere, although most have good bus connections. Even the Mandurah terminus is a long way from what is Mandurah “city” centre (nothing much of a centre there really...). Rockingham station was relocated rather a long way from the town centre to save costs, while instead the line was built on a more direct route towards the Perth city centre (initially it was planned to run from Thornlie towards Cockburn along the freight line corridor. So what you gain by a fast train you may lose again by a connecting bus ride to take you home.
The rail system is publicly operated by Transperth and fully integrated with bus services (and one ferry line). The metropolitan area is divided into 9 circular fare zones, which extend more than 100 km north-south. A dayrider ticket is available at AUD 9.00 for travel after 9:00 am, and valid in all zones. Similar to Brisbane, most people travel with a Smartrider smartcard, but single tickets and day tickets are sold as paper tickets; there are ticket barriers at busy stations, but to check paper tickets at least one gate needs to be manned. Transit officers (and there are more of them visible in Perth than anywhere else in Australia!) carry out tickets inspections on trains, too.
Buses, like everywhere in Australia, are abundant and hard to understand as once again no maps are available, just a printed timetable for each line. Quite useful for visitors, but also busy with locals, are the CAT buses, these are three free bus routes in the central area of Perth, plus one in Fremantle. Surprisingly, there are maps with proper stop information for these lines, even next-bus indicators at stops, whereas for regular bus routes, often a one meter high post with only the bus stop number seems sufficient! So, in this field, Perth unfortunately is not much better than any other Australian city.
All in all, Perth has proved that if you provide a good rail service, it will be successful, but no doubt it has required a high investment, first to electrify the old system and then double the network's length by building two state-of-the-art routes.